Completed Project

Facebook Twitter Gmail Print Addthis

Gagasan Rhema Engineering Sdn Bhd was formed in the year 2010 by a team of experienced professionals consisting of managing director, project managers, site manager, geologists, boring and soil testing experts.

Associated with Gagasan Teguh Sdn Bhd, a soil investigation company established since 1991, Gagasan Rhema Engineering offers a wider range of related but specialized scope of services such as Soil Nailing, Guniting, Micropilling, Tube Well Installation and other Geotechnical related works.

Through our expertise, innovation and the latest engineering tools, we aim to deliver the highest standard possible in this industry. All our staffs are professionally trained and qualified in their various positions and well equipped to tackle any project nationwide with our established network of associates.

Client :DATUK BANDAR KUALA LUMPUR (DBKL)
Main Contractor :INFRA TEGUH SDN. BHD.

CADANGAN MEMPERTINGKATAN JALAN GENTING KLANG DARI PERSIMPANGAN JALAN

1/27A HINGGA JALAN LINGKARAN TENGAH 11, KUALA LUMPUR (2013/A033). – PACKAGE 2

– CONTIGUOS BORED PILE WALL

Date of Commencement :03rd September 2014
Client :(CONSULTANT) HACENT CONSULTANT
Main Contractor :L.K.C. VENTURES SDN BHD

PROPOSED SOIL NAILING & GUNITING WALL FOR CADANGAN PEMBANGUNAN PERUMAHAN DI ATAS LOT PT 33958 – 33978, (LOT 229 – 238 & 402 – 405), DI MUKIM SEMENYIH, DAERAH HULU LANGAT, SELANGOR DARUL EHSAN.

Date of Commencement :19th August 2014
Client :RUMPUN PELANGI SDN BHD

PROPOSED SOIL NAILING WORKS AT LOT 1122 & 1123, MUKIM SERENDAH, DISTRICT OF HULU SELANGOR, SELANGOR DARUL EHSAN. – SOIL NAILING WORKS (DESIGN & BUILT)

Date of Commencement :19th August 2014
Client :DYNAMIC MANAGEMENT SDN. BHD. (IOI GROUP)
Main Contractor :GPE ENTERPRISE SDN. BHD.

PROPOSED SLOPE STABILIZATION WORKS AT KOI KINRARA, PUCHONG, SELANGOR DARUL EHSAN – HORIZONTAL DRAIN

Date of Commencement :04th August 2014
Client :JERNIH CENDANA SDN BHD.
Main Contractor :(CONSULTANT) G&P PROFESSIONALS S/B

PROPOSED SLOPE STRENGTHENING WORKS FOR CADANGAN PEMBANGUNAN PERNIAGAAN (STESEN MINYAK) YANG MENGANDUNGI SEBUAH KEDAI SERBANEKA DENGANG RUANG PEJABAT, TANDAS SERTA SURAU DI ATAS LOT 26075 (GM 4068), KM60, LEBUHRAYA KARAK, MUKIM BENTONG, PAHANG DARUL MAKMUR. – SOIL NAILING, HORIZONTAL DRAIN AND GUNITING WORKS.

Date of Commencement :07th July 2014
Client :GASING MERIDIAN SDN. BHD.
Main Contractor :BINAFORM SDN. BHD.

CADANGAN PEMBANGUNAN 71 LOT-LOT KEDIAMAN SESEBUAH DI ATAS LOT 37180, 37184 - 37198, 37230 - 37219, 37223 - 37237, 37239 - 37255, 3257 - 37262, MUKIM KUALA LUMPUR, WILAYAH PERSEKUTUAN KUALA LUMPUR. – SOIL NAILING WORKS.

Date of Commencement :30th June 2014
Client :IJM LAND BERHAD.
Main Contractor :IJM BUILDING SYSTEMS.

CADANGAN PEMBANGUNAN 1 BLOK PANGSAPURI KOS SEDERHANA TINGGI 38 TINGKAT YANG MENGANDUNGI 31 TINGKAT PANGSAPURI (236 UNIT), 1 TINGKAT KEMUDAHAN PENDUDUK, 4 TINGKAT TEMPAT LETAK KERETA, 2 TINGKAT M&E DAN SERVIS SERTA 1 BLOK ANNEXE TEMPAT LETAK KERETA YANG MENGANDUNGI 4 ½ TINGKAT DAN 1 TINGKAT KEMUDAHAN REKREASI DI ATAS LOT 45752 (LOT ASAL 25839-25846 DAN SEBAHAGIAN LOT 25833-25838), MUKIM PETALING CHERAS, KUALA LUMPUR. – SOIL NAILING & GUNITING WORKS. (BUKIT MANDARINA, CHERAS)

Date of Commencement :20th February 2014
Main Contractor :KITACON SENDIRIAN BERHAD

CADANGAN MEMBINA DAN MENYIAPKAN 206 UNIT RUMAH TERES DUA TINGKAT, SATU UNIT PENCAWANG ELEKTRIK DI FASA 4, PERSIARAN PUNCAK BESTARI 1, BANDAR PUNCAK ALAM, MUKIM IJOK, KUALA SELANGOR. - TUBE WELL INSTALLATION.

Date of Commencement :28th March 2014
Client :MR. TAN YEN HENG
Main Contractor :L.T. PILING SDN. BHD.

PROPOSED SOIL NAILING WORKS AT BUNGLOW LOT 53901, JALAN BUKIT SEGAR 7, TAMAN BUKIT SEGAR, CHERAS, KUALA LUMPUR.

Date of Commencement :11th March 2014
Client :DATUK BANDAR KUALA LUMPUR (DBKL)
Main Contractor :INFRA TEGUH SDN. BHD.

CADANGAN MEMPERTINGKATAN JALAN GENTING KLANG DARI PERSIMPANGAN JALAN 1/27A HINGGA JALAN LINGKARAN TENGAH 11, KUALA LUMPUR. – CONTIGUOUS BORED PILLING WORKS & SOIL NAILING WORKS

Date of Commencement :30th September 2013